And here is another hybrid station based on Deye equipment and two Dyness batteries with a total reserve of 9.6 kWh. Also, 13.28 kW of Longi Solar PV modules were installed. Such a station will not only significantly reduce consumption, but also provide the building with electricity in the event of a power outage. Let's bring the future closer together!