The installation of the first stage of the network station under the “Green Tariff” has been completed. In the future, the Customer plans to increase the power of the station to 30 kW. Monocrystalline photovoltaic modules Seraphim Mono PERC 320 (Tier1), in the amount of 30 pieces, are installed on the roof. Anodized aluminum mounting system. Network inverter SUN2000-33KTL with a capacity of 30 kW from a trusted manufacturer Huawei. Excess generated electricity is sold under the “Green Tariff”.