The installation of the first stage of the network station under the “Green Tariff” has been completed. There is the possibility of further expansion with a possible increase in power in the future up to 30 kW. Photovoltaic modules Risen RSM60-6 280P /5BB (Tier1) are installed at the facility, which are located on support structures on the ground. Network inverter from a trusted manufacturer Huawei SUN2000-33KTL 30 kW. Excess generated electricity is sold under the “Green Tariff”.