Solar power plant for your own needs

  • Location: Sauvignon.
  • Power of the photovoltaic field: 5 kW.
  • Implementation period: one day.
If there is no need to apply for a "green" tariff, you can always build a station for your own needs. This is exactly what our customer did, whom we met while servicing a solar hot water system. The construction of the solar station made it possible to become even less vulnerable to power outages by integrating LiFePo4 storage into the system.